| 1. | Can concrete be poured into a hole with water in it?
|
| 2. | Many contractors require that the concrete be in place within 90 minutes after loading.
|
| 3. | The company also ordered that additional concrete be laid on floor to act as water barrier.
|
| 4. | The depth of the foundations was increased to utilise a concrete bed thick, supported by piles long.
|
| 5. | Should the concrete be prepped before staining?
|
| 6. | Schussler was also very demanding that the concrete be batched in the exact proportions of his mix design.
|
| 7. | If the original post is set in concrete be careful when removing it; it can weigh 100 pounds or more.
|
| 8. | The entire length of the branch is artificially channelled and straightened, and much of it lined with a concrete bed.
|
| 9. | Each Z-Unit cell is equipped with a full set of body restraints that are built directly into the concrete bed.
|
| 10. | I know the concrete can go over the crushed stone, but can four inches of concrete be laid over the old asphalt?
|